![Chauvin Arnoux Green TEST-FTV 100 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/chauvin-arnoux/green-test-ftv-100/green-test-ftv-100_user-manual_2594607032.webp)
GREEN TEST-FTV 100
English
Page 32 sur 47
♦
printing of measurement reports and of the declaration of conformity issued at the end of the
tests of the site;
♦
real-time analysis of all measurements (manual or automatic) of the PV system;
♦
graphic display of all measurements of the PV system vs. time.
8.19.1 GREEN REPORT SOFTWARE INSTALLATION PROCEDURE
1.
Insert the CD-ROM provided in the drive of the PC;
2.
Click on the GREEN REPORT folder. When you have opened the folder, open the PDF
instruction file it contains and follow the instructions to ensure correct installation of the GREEN
REPORT software;
3.
Once installed, the GREEN REPORT software is ready to be used.
8.19.2 FUNCTIONS OF THE GREEN REPORT SOFTWARE
GREEN REPORT has several icons that represent its functions.
8.19.2.1 CONFIGURATION
By clicking on this icon, you can check the status of communication between the instrument (base unit) and
the remoted module.
Access to the CONFIGURATION function lets you perform the following operations:
♦
selection of the power calculation method (see the ADJUSTMENTS menu);
♦
selection of the number of DC inputs (current, voltage);
♦
selection of the number of AC inputs (current, voltage);
♦
selection of the minimum insolation for the efficiency calculation (very important if you want to
perform tests with an insolation of less than 600 W/m².
8.19.2.2 CONNECTION OF THE INSTRUMENT TO THE PC:
1.
To transfer the data acquired to the PC, connect the instrument to the PC using the USB cable:
♦
Click on the "CONFIGURATION" icon.
♦
Select the COM port of the device in the pull-down menu (if the COM port number does not
appear, look for it in the Windows Peripherals Manager).
♦
Click on “CONNECT THE BASE UNIT”.
♦
Wait for CONNECTION STATUS to be displayed:
- Green light (connection established);
- Red light (no connection).
2.
Acquisition of measurements in REAL TIME in LOCAL mode
♦
Connect the instrument to the PC using the USB cable.
♦
Click on the "CONFIGURATION" icon.
♦
Select the COM port of the device in the pull-down menu (if the COM port number does not
appear, look for it in the Windows Peripherals Manager).
♦
Click on "CONNECT THE BASE UNIT".
♦
Wait for CONNECTION STATUS to be displayed:
- Green light (connection established);
- Red light (no connection).
♦
Click on the REAL TIME icon (refer to the description of the REAL TIME menu).
Содержание Green TEST-FTV 100
Страница 1: ... Testing instrument for photovoltaic installations ENGLISH User s manual ...
Страница 14: ...GREEN TEST FTV 100 English Page 14 sur 47 ...
Страница 15: ...GREEN TEST FTV 100 English Page 15 sur 47 ...
Страница 35: ...GREEN TEST FTV 100 English Page 35 sur 47 Example of a Report of on site measurement on the tests performed ...