21
Model UH130, UH130B, UH230, UH230B - Installation
Detergent and Rinse-aid Dispensing Pumps - Pump and Fill Adjustments
UH130, UH130B and UH230, UH230B
To adjust the amount of chemicals dispensed
by the pumps:
1. Make sure the chemical containers are full and
the pick-up tubes are in their proper containers.
3. Turn the dishwasher power switch ON.
The switch will illuminate and the dishwasher
will fill with water.
4. Run a normal dishwasher cycle and test
detergent and rinse-aid concentrations
according to the chemical supplier's
instructions.
CAUTION:
Excessive pressure to the potentiometers when
adjusting can result in bent or broken adjusting
screws.
5. Each dispensing pump has a clearly marked
adjustment screw. Turn the screw CW to
increase the run time of the dispensing pump
and CCW to reduce the run time.
UH130, UH130B only
To adjust the tank fill:
1. The fill adjustment screw will provide a
small change in the tank water level.
2. If a large adjustment is needed, check the
incoming water pressure and make sure the fill
hose is not kinked.
3. If the above items are okay then the size
of the incoming water supply should be
checked. The incoming water supply line must
be a minimum of 1/2" or larger.
Refer to the photo below:
Fill Adjustment
For UH130, UH130B
Only
Use a 4mm
blade
screwdriver
Содержание UH130 M4
Страница 68: ...58 Timer Board Connection Diagram All Models ...
Страница 74: ...64 Blank Page This Page Intentionally Left Blank ...
Страница 75: ...65 Model UH330B High Temperature Undercounter Dishwasher with Heat Recovery and Built in Booster Model UH330B ...
Страница 104: ...94 Blank Page This Page Intentionally Left Blank ...
Страница 106: ...96 Wash Pump Motor Assembly All Models 1 11 12 2 3 4 5 7 8 9 10 6 13 14 15 ...
Страница 111: ...101 Blank Page This Page Intentionally Left Blank ...
Страница 114: ...104 Fill Solenoid Valve UH130 UH130B UH330B UL130 1 2 3 4 9 5 6 7 8 ...
Страница 118: ...108 Upper Final Rinse Piping UH230 UH230B 1 2 3 4 6 5 6 6 7 8 9 4 8 10 13 11 12 14 15 16 17 18 19 21 22 23 20 ...
Страница 120: ...110 From Manifold Rinse Outlet Port 1 2 2 1 1 3 4 4 5 5 6 7 5 9 8 10 From Booster Final Rinse Piping UH330B ...
Страница 122: ...112 Heat Recovery Assembly UH330B 1 2 7 5 6 7 8 9 9 10 12 11 24 23 3 13 25 14 15 16 17 18 15 14 15 19 20 21 22 4 ...
Страница 126: ...116 Fill Chute Assembly UH130 UH130B UL130 1 10 2 3 4 5 6 9 7 8 11 12 13 14 15 16 21 18 19 17 17 17 17 20 ...
Страница 134: ...124 Booster Assembly UH130B UH230B 1 1 2 2 3 4 1 6 5 7 8 9 10 11 12 13 4 15 14 ...
Страница 138: ...128 Timer Control Board Assembly UH130B UH230B UH330B Rear View Front View 1 10 2 4 4 5 6 2 4 7 8 9 11 12 13 3 ...
Страница 144: ...134 Control Panel UH130 UH130B 1 2 3 6 7 10 8 8 9 9 11 10 4 5 5 ...
Страница 146: ...136 Control Panel UH230 UH230B 1 2 3 3 2 6 5 7 5 10 8 8 9 9 11 10 4 ...
Страница 148: ...138 Control Panel UH330B 1 2 2 3 6 5 7 5 10 8 8 9 9 11 10 4 ...
Страница 150: ...140 Control Panel UL130 7 9 8 3 6 1 2 4 4 10 7 5 5 3 Thermometer probe located in wash tank ...
Страница 152: ...142 Panels UH130 UH130B UH230 UH230B UL130 1 10 2 3 4 6 5 7 8 9 11 12 13 13 ...
Страница 154: ...144 Panels UH330B 1 3 4 2 5 6 7 9 8 ...
Страница 156: ...146 Door Assembly All Models 1 10 4 5 6 6 7 7 9 9 8 10 2 3 3 5 ...
Страница 158: ...148 Dish Racks Line Strainer PRV 1 2 3 4 ...
Страница 160: ...150 This Page Intentionally Left Blank Blank Page ...
Страница 162: ...152 Electrical Schematic UL130 UL130 ...
Страница 163: ...153 Electrical Schematic UH130 UH130B UH230 UH230B SINGLE PHASE THREE PHASE UH130 UH130B UH230 UH230B ...
Страница 164: ...154 Electrical Schematic UH330B UH330B ...
Страница 165: ...155 Timing Charts UH130 UH130B UH230 UH230B UL130 UH230 UH230B UH130 UH130B UL130 UL130 ...
Страница 166: ...156 Timing Chart UH330B UH330B Timing Charts ...