![Champion UH130 M4 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/champion/uh130-m4/uh130-m4_installation-and-operation-manual_2588562020.webp)
10
Water Connections - UH130, UH130B, UH230, UH230B
1. All models have a 6 ft. flexible hot water fill hose with a 3/4" female garden hose connector.
2. A 1/2" or larger main incoming supply line must be installed to the dishwasher.
3. A 1/2" or larger shut-off valve should be installed in the main water supply, as close to the
dishwasher as possible for servicing.
FOR UH130: The UH130 has a built-in flow control. The flowing incoming hot water supply
pressure must be between 25-95 psi. The hot water supply must provide a minimum of
180°F/82°C, measured at the dishwasher.
FOR UH130B: The UH130B has a built-in flow control. The flowing incoming hot water
supply pressure must be between 25-95 psi. The hot water supply must provide a minimum
of 140°F/60°C, measured at the dishwasher for 40°F/22°C rise booster or 110°F/43°C for
70°F/39°C rise booster.
4. FOR UH230: The hot water supply must provide a minimum of 180°F/82°C, measured at the
dishwasher.
A pressure regulating valve, PRV, (supplied), must be installed after the shut-off
service valve if the incoming flow pressure exceeds 20-22 psi.
FOR UH230B: The hot water supply must provide a minimum of 140°F/60°C, measured at the
dishwasher for 40°F/22°C rise booster or 110°F/43°C for 70°F/39°C rise booster.
A pressure regulating valve, PRV, (supplied), must be installed after the shut-off service valve if
the incoming flow pressure exceeds 20-22 psi.
5. A water hardness of 3 grains/gal (US) [5.3 mg/L] or less is recommended. Excessively hard
water will negatively impact wash results.
! VERY IMPORTANT !
Make sure the flexible water supply and drain hoses are not kinked.
Plumbing connections must allow the machine to be pulled out for service and cleaning.
Plumbing connections must comply with national, provincial local plumbing and sanitary
codes. Only qualified service personnel familiar with food service equipment should install
the machine.
The installing plumber must thoroughly flush the water supply line to remove all debris
BEFORE connecting the water supply line to the machine.
Installation - Model UH130, UH130B, UH230, UH230B
Содержание UH130 M4
Страница 68: ...58 Timer Board Connection Diagram All Models ...
Страница 74: ...64 Blank Page This Page Intentionally Left Blank ...
Страница 75: ...65 Model UH330B High Temperature Undercounter Dishwasher with Heat Recovery and Built in Booster Model UH330B ...
Страница 104: ...94 Blank Page This Page Intentionally Left Blank ...
Страница 106: ...96 Wash Pump Motor Assembly All Models 1 11 12 2 3 4 5 7 8 9 10 6 13 14 15 ...
Страница 111: ...101 Blank Page This Page Intentionally Left Blank ...
Страница 114: ...104 Fill Solenoid Valve UH130 UH130B UH330B UL130 1 2 3 4 9 5 6 7 8 ...
Страница 118: ...108 Upper Final Rinse Piping UH230 UH230B 1 2 3 4 6 5 6 6 7 8 9 4 8 10 13 11 12 14 15 16 17 18 19 21 22 23 20 ...
Страница 120: ...110 From Manifold Rinse Outlet Port 1 2 2 1 1 3 4 4 5 5 6 7 5 9 8 10 From Booster Final Rinse Piping UH330B ...
Страница 122: ...112 Heat Recovery Assembly UH330B 1 2 7 5 6 7 8 9 9 10 12 11 24 23 3 13 25 14 15 16 17 18 15 14 15 19 20 21 22 4 ...
Страница 126: ...116 Fill Chute Assembly UH130 UH130B UL130 1 10 2 3 4 5 6 9 7 8 11 12 13 14 15 16 21 18 19 17 17 17 17 20 ...
Страница 134: ...124 Booster Assembly UH130B UH230B 1 1 2 2 3 4 1 6 5 7 8 9 10 11 12 13 4 15 14 ...
Страница 138: ...128 Timer Control Board Assembly UH130B UH230B UH330B Rear View Front View 1 10 2 4 4 5 6 2 4 7 8 9 11 12 13 3 ...
Страница 144: ...134 Control Panel UH130 UH130B 1 2 3 6 7 10 8 8 9 9 11 10 4 5 5 ...
Страница 146: ...136 Control Panel UH230 UH230B 1 2 3 3 2 6 5 7 5 10 8 8 9 9 11 10 4 ...
Страница 148: ...138 Control Panel UH330B 1 2 2 3 6 5 7 5 10 8 8 9 9 11 10 4 ...
Страница 150: ...140 Control Panel UL130 7 9 8 3 6 1 2 4 4 10 7 5 5 3 Thermometer probe located in wash tank ...
Страница 152: ...142 Panels UH130 UH130B UH230 UH230B UL130 1 10 2 3 4 6 5 7 8 9 11 12 13 13 ...
Страница 154: ...144 Panels UH330B 1 3 4 2 5 6 7 9 8 ...
Страница 156: ...146 Door Assembly All Models 1 10 4 5 6 6 7 7 9 9 8 10 2 3 3 5 ...
Страница 158: ...148 Dish Racks Line Strainer PRV 1 2 3 4 ...
Страница 160: ...150 This Page Intentionally Left Blank Blank Page ...
Страница 162: ...152 Electrical Schematic UL130 UL130 ...
Страница 163: ...153 Electrical Schematic UH130 UH130B UH230 UH230B SINGLE PHASE THREE PHASE UH130 UH130B UH230 UH230B ...
Страница 164: ...154 Electrical Schematic UH330B UH330B ...
Страница 165: ...155 Timing Charts UH130 UH130B UH230 UH230B UL130 UH230 UH230B UH130 UH130B UL130 UL130 ...
Страница 166: ...156 Timing Chart UH330B UH330B Timing Charts ...