Chapter 2
DDR SDRAM Specifications
Memory Frequency
Internal System BUS Frequency
133 MHz
266 MHz
166 MHz (7VIF4 only)
333 MHz (7VIF4 only)
DRAM Specifications
DIMM type: 2.5V, unbuffered 184 pin 64/128/265/512-bit DDR SDRAM.
Module size: Single/double-sided 64/128/256/512Mbytes or 1GBbtes.
Parity: Ether parity or non-parity.
2-4 Connector and Jumper Settings
Connectors are used to link the system board with other parts of the system, including the
power supply, the keyboard, and the various controllers on the front panel of the system
case.
The power supply connector is the last connection to be made while installing a
motherboard. Before connecting the power supply, please make sure it is not connected to
the power source.
Note
:
All cables are
security-proof
.
PW1 (ATX Power Supply Connector)
The power cord leading from the system's power supply to the external power source
must be the very last part connected when assembling a system. The ATX power supply
provides a single 20-pin connector interface, which incorporates st/-5V, +/-12V,
optional 3.3V and Soft-power signals. The Soft power signal, a 5V trickle supply is
continuously supplied when AC power is available. When the system is in the Soft-Off
mode, this trickle supply maintains the system in its minimum power state.
The ATX 12V power supply has a new +12V (4-pin) and +5V/3.3V (6-pin) auxiliary
power connector in order to enable the delivery of more +12 VDC and +5/3.3V VDC
8
Содержание 7VIF3
Страница 1: ...7VIF3 7VIF4 AMD Socket A VIA KM266 KM400 VT8235 u ATX Motherboard User s Guide Version 1 0...
Страница 7: ...Chapter 1 1 3 7VIF3 7VIF4 Motherboard Layout 3...
Страница 41: ...Chapter 4 3 Please select Yes to accept the license agreement 4 Please select Next to continue 37...
Страница 43: ...Chapter 4 7 Please select Next to continue installing AGP Driver 8 Please select OK to restart your computer 39...
Страница 44: ...Chapter 4 4 2 Audio Driver Setup 1 Click Audio Driver 2 Click Next to start software installation 40...
Страница 47: ...Chapter 4 7 Please select OK to complete the setup process 4 3 LAN Driver Setup 1 Click LAN Driver 43...
Страница 48: ...Chapter 4 2 Please select Next to continue 3 Please click Finish to complete the setup process 44...
Страница 49: ...Chapter 4 4 4 USB 2 0 Driver 1 Click USB 2 0 Driver 2 Please select Next to continue 45...
Страница 50: ...Chapter 4 3 Please select Next to continue 4 Please select Yes to accept the license agreement 46...