page 26
www.CentSys.com
8. Critical Installation Checklist
S
ECTION
8
CRITICA
L
INS
TALLA
TION
CHECKLIS
T
The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VANTAGE operator(s):
•
Ensure that the Wall Bracket is securely anchored
•
Make sure that the operator’s maximum stroke is being utilised
•
Only use V-Series cable for the installation
•
Leave a 350mm long loop in the cable
•
Fit an electric gate lock if the leaf width is greater than 3 metres
•
Ensure that the opening and closing angles conform to the installation guidelines
•
Ensure that your gate and operator(s) are equipped to deal with Wind Loading
(refer to the Table 6 and 7 on page 14)
Never run the operator directly from the battery! Doing so will cause
damage to the operator. Only run the operator from the V-Series
Controller.
Содержание VANTAGE 400
Страница 7: ...page 7 www CentSys com This section has been left blank intentionally...
Страница 42: ...page 42 www CentSys com NOTES Notes...
Страница 43: ...page 43 www CentSys com NOTES Notes...