page 32
www.CentSys.com
S
ECTION
9
FIGURE 18. WALL BRACKET HEIGHT
Wall Bracket
Minimum 125mm
Gate
Gate Bracket position
9.2. Step 2
Determine a suitable height for the
Wall Bracket.
Ensure that this mounting
height will allow the Gate
Bracket to be securely
mounted to the Gate Leaf.
Take care to make sure
the operator is mounted
level.
9.3. Step 3
Mark the determined length on the
Wall Bracket.
Cut off excess length.
Insert the Wall Bracket into the
mounting plate.
Weld the brackets together.
FIGURE 19. CUT AND WELD WALL BRACKET
Mark length
on bracket
Weld plates
together
Cut off
excess length
Wall Bracket
length
FIGURE 20
Wall
Mounting bolt
Wall
Bracket
It is critical that the
Wall Bracket is securely
mounted.
See page 18 for Site
Considerations.
9.4. Step 4
Mount the Wall Bracket according to
the A- and B-Values obtained in
Step 1 on page 27.
OPERA
TOR
INS
TALLATION
-
INW
ARD
OPENING
GA
TES
Содержание VANTAGE 400
Страница 7: ...page 7 www CentSys com This section has been left blank intentionally...
Страница 42: ...page 42 www CentSys com NOTES Notes...
Страница 43: ...page 43 www CentSys com NOTES Notes...