ATTENTION! When connecting the boiler to
a solid fuel boiler system, where the same
pump is used for both boilers, the pump
should be electrically connected according
to the connection diagram given in section
5.3. This ensures that the pump for both
boilers is switched on correctly.
4.3
Demounting front boiler casing
Boiler casing can be removed for simple handling and
installation (image 4)
Unscrew 3 bolts at top lid
Unscrew 3 bolts at bottom lid
With slow pulling toward you demount front casing of the
boiler
Image 4 :
Opening the boiler (Demounting front casing)
4.4
Mounting boiler
NOTE:
Material damage occurred by irregular
installation on the wall
!
It is necessary to use proper material for fixing
This chapter describes boiler mounting on the wall
Draw position of drilling holes for mounting set respecting
minimum distances (image 3)
Drill holes upon dimensions given in (image 2)
Put into drilled holes plastic dowel enclosed in device
packaging (or adequate dowel for unusual kind of wall)
Then screw bolts into delivered dowels (or other) in such
way that are left out from the wall min 5 mm-max 10mm
Carefully hang device on the wall
Make sure that boiler is placed vertically
Fixed boiler on the wall by mounting set and screw
4.5
Hydraulic attachments execution
NOTE:
Material damages caused by permeable
connections!
Attachment duct lines install without
connecting on boiler connections
Heating duct lines connect as follows:
Connect return line on connection IN
Connect start line on connection OUT
4.6
Systems on which the eBasic boiler can
be connected
All systems for heating the space designed for 80/60
temperature regime (or lower)
Closed heating systems
Systems with boiler on solid fuel
Excessive temperature stresses of the boiler are
possible, as well as damage to the heater, seals and
boiler vessel.
It can be used as heating device for water in accumulating
boilers over exchanger.
It can also be used in certain technological processes
providing that there is no need for water temperature
higher than 60°C.
It must not be used for direct heating of domestic hot
water.
Installation
Содержание El-Cm eBasic 12kW
Страница 19: ...Electric connecting Image 12a Boiler electric scheme eBasic with nominal power of 6kW...
Страница 20: ...Electric connecting Image 12b Boiler electric scheme eBasic with nominal power of 9kW and 12kW...
Страница 21: ...Electric connecting Image 13a Boiler electric scheme eBasic with nominal power of 18kW...
Страница 22: ...Electric connecting Image 13b Boiler electric scheme eBasic with nominal power of 24kW...
Страница 23: ...Electric connecting Image 14 Boiler electric scheme eBasic with nominal power of 30kW 36kW and 40kW...