Page 16 | 1-800-343-9463
WM&FD TWIN
051019
PREPARING THE FULLY DUCTED EVAPORATOR UNITS
1.
Remove the knockouts that you will be using to
route the line set, power wires, and drain line.
2.
Remove the insulation from the knockout holes.
3.
For ease of installation, remove the nine (9)
screws securing the top and remove the top.
4.
Follow the directions on page 22 to mount the
remote display and run the display cable to the
evaporator unit.
Power
Line set
Drain line
Bottle probe connector routing location