www.cellarcool.com | Page 39
WM & FD Twin
Copeland Wiring Procedure
Step #
4
Route the required 208/230V power wires into the open
clamp on the enclosure.
Copeland Wiring Procedure
Step #
3
Pull the controller panel forward and rest it in the down position to expose the
internal compartment.