Step 30: Attach TNR 4 Clamp Rings
Hardware
10 x
1/4 x 1” Pan Bolt
(1/4” lock nut)
PB6
Other Parts
10 x TNR4 Clamp Ring
A:
Place 2 TNR4 Clamp Rings around each joint on the top 4 slide sections making sure to match the arrows
with the end of the Clamp Ring as shown in fig. 30.1 and 30.2. On the final section, rotate the clamp ring as
shown. (fig. 30.1 and 30.2)
B:
Connect TNR4 Clamp Rings in 2 spots using 1 (PB6) ¼ x 1” Pan Bolt (with lock nut) per side. (fig. 30.3)
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round
recess and the lock nuts go through the side with the hexagonal recess.
Fig. 30.1
Fig. 30.2
Fig. 30.3
TNR4
Clamp
Rings
TNR4
Clamp
Rings
PB6
PB6
Lock
Nut
Lock
Nut
TNR4
Clamp
Rings
After the clamp rings are attached to
the elbows, fasten them end to end
with two pan bolts and lock nuts
75
Make sure arrows
are aligned
Содержание F25720
Страница 107: ...NOTES 107 europecustomerservice kidkraft com ...