A:
Measure 5-1/2” from the top of (025) RW-AL Support and on (052) Back Wall Panel in the 2 places shown
below, pre-drill with a 1/8” drill bit making sure holes are centred then attach 2 Steel Hand Grips with 2 (WL3)
1/4 x 1-3/8” Wafer Lag (with flat washer) per Steel Hand Grip. (fig. 11.1 and 11.2)
Hardware
Fig. 11.1
052
1/4” Flat
Washer
Fig. 11.2
052
025
4 x
1/4 x 1-3/8” Wafer Lag
(1/4” flat washer)
Steel
Hand
Grip
Steel Hand Grip
Other Parts
2 x Steel Hand Grip
5-1/2”
5-1/2”
Step 11: Attach Steel Hand Grips to Fort
1/4” Flat
Washer
WL3
WL3
WL3
38
Содержание F25720
Страница 107: ...NOTES 107 europecustomerservice kidkraft com ...