Step 16: Swing Post Assembly
Part 2
D:
Place Swing End of (150) Engineered SW Beam in between Heavy L-Brackets assembled in Step A making
sure holes are lined up then attach Swing Post Assembly to Swing Beam Assembly using 1 (G20) 3/8 x 4” Hex
Bolt (with 2 flat washers and lock nut) through Heavy L-Bracket. (fig. 16.5)
E:
Attach (150) Engineered SW Beam to Heavy C-Bracket with 1 (G17) 3/8 x 6” Hex Bolt (with 2 flat washers,
plastic formed washer and lock nut). (fig. 16.6)
1 x
3/8 x 6” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
1 x
3/8 x 4” Hex Bolt
(3/8” flat washer x 2 & 3/8” lock nut)
G17
Hardware
G20
3/8” Flat
Washer
3/8” Lock Nut
Heavy
L-Bracket
3/8” Flat
Washer
Plastic
Formed
Washer
3/8” Flat
Washer
3/8” Lock
Nut
Heavy C-Bracket
G20
3/8” Flat
Washer
150
150
Fig. 16.5
Fig. 16.6
G17
49
Содержание F25720
Страница 107: ...NOTES 107 europecustomerservice kidkraft com ...