![Cedar Summit F25720 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/cedar-summit/f25720/f25720_installation-and-operating-instructions-manual_2578707023.webp)
Step 3: Rockwall Assembly
Part 2
9 x
1/4 x 1-1/4 Pan Bolt
(1/4” lock washer, 3/16” flat washer & 1/4” barrel nut)
9 x
#8 x 1” Pan Screw
PB2
Hardware
Other Parts
9 x Rocks (green/yellow/burgundy)
S10
C:
Alternating colours and shapes, attach 1 rock to each rock board using 1 (PB2) 1/4 x 1-1/4” Pan Bolt (with
lock washer, flat washer and barrel nut) and 1 (S10) #8 x 1” Pan Screw per rock. (fig. 3.2 and 3.3)
The Pan Screw is placed in the hole beneath the Pan Bolt. (fig. 3.2 and 3.3)
Note: Make sure all hardware is used to secure each rock properly.
Fig. 3.2
3/16” Flat
Washer
1/4”
Barrel Nut
Fig. 3.3
S10
PB2
1/4” Lock
Washer
23
Содержание F25720
Страница 107: ...NOTES 107 europecustomerservice kidkraft com ...