
Plunger Information
B-7
C
ASE
4. M
OVE TOO
S
MALL TO
R
EACH
T
OP
V
ELOCITY
Case 4 is used when Vn < V and Vn > c
Diagram of Move:
v
V
Speed [Hz]
c
time in s
t
Vn
Calculation:
v = 50 Hz
L = 14
V = 5800 Hz
A = 350 full steps
c = 900 Hz
Top Velocity
Vn
AL
v
c
=
+
+
=
∗
∗ ∗
+
+
=
2
2
2 350 14 2500
50
900
2
4991
2
2
2
2
Hz
Total Move Time
t
L
Vn
v
c
L
=
− − =
∗
−
−
=
1
2
1
2 4991 50 900
26
(
)
(
) .
seconds
Содержание XP 3000
Страница 21: ...Hardware Setup 2 5 RS 232 CABLING Figure 2 3 RS 232 Multi Pump Cabling nc ...
Страница 22: ...Hardware Setup 2 6 RS 485 CABLING Figure 2 4 RS 485 Multi Pump Cabling RS 485 A RS 485 B ...
Страница 23: ...Hardware Setup 2 7 CAN CABLING Figure 2 5 CAN Multi Pump Cabling ...
Страница 36: ...Hardware Setup 2 20 Figure 2 12 XP 3000 Threaded Mount Holes ...
Страница 134: ......