
Plunger Information
B-4
v
V
Speed [Hz]
c
time in s
t
Calculation:
v = 50 Hz
L = 14
V = 5800 Hz
A = 3000 full steps
c = 500 Hz
Ramp Up Steps
A
V
v
L
1
2
2
2
2
2
5800
50
2 14 2500
481
=
−
=
−
∗ ∗
=
half steps
Ramp Down Steps
A
V
c
L
3
2
2
2
2
2
5800
500
2 14 2500
477
=
−
=
−
∗ ∗
=
half steps
If
A
A
A
1
3
2
+
<
(481 + 477 < 6000) then:
Ramp Up Time
t
V
v
L
1
5800 50
14 2500
16
= − =
−
∗
=
.
seconds
Ramp Down Time
t
V
c
L
3
5800 500
14 2500
15
= − =
−
∗
=
.
seconds
Constant Speed Steps
A
A
A
A
2
1
3
2
2 3000
481 477
5042
=
−
−
= ∗
−
−
=
half steps
Содержание XP 3000
Страница 21: ...Hardware Setup 2 5 RS 232 CABLING Figure 2 3 RS 232 Multi Pump Cabling nc ...
Страница 22: ...Hardware Setup 2 6 RS 485 CABLING Figure 2 4 RS 485 Multi Pump Cabling RS 485 A RS 485 B ...
Страница 23: ...Hardware Setup 2 7 CAN CABLING Figure 2 5 CAN Multi Pump Cabling ...
Страница 36: ...Hardware Setup 2 20 Figure 2 12 XP 3000 Threaded Mount Holes ...
Страница 134: ......