
18
5 Operation
After proper installation Welding Camera is ready for operation. In the following the
operation of the system is described in more detail.
5.1 Before operation
Before operation the following preliminary issues need to be performed:
check that camera unit is properly installed
check that the replaceable protective window of the camera unit is clean
power up the computer
check that the electrical connections are as described in Section 4.2.
make sure that the safety instructions (Chapter 2) have been properly followed
connect the power supply cable to AC mains. This will power up the system. Green
led in the camera unit will switch on
5.2 CAVITAR Capture software
Welding Camera is operated with CAVITAR Capture software. Before launching CAVITAR
Capture, ensure that possible firewall or virus protection programs do not prevent the use of
CAVITAR Capture (Welding Camera contains a GigE camera with a GigE interface).
In some cases the following actions may be needed:
disconnect any network connections the computer may have. Also wireless networks
should be disabled if firewall and virus protection settings need to be relaxed
adjust firewall and virus protection settings in such a way that all network traffic is
allowed
connect the GigE cable to your computer after which the computer starts searching for
the camera (this may take several minutes). Typical announcements in Windows
taskbar are “Identifying…No network access” (before connection to the camera is
established) and “Unidentified network, No network access” (after connection to the
camera is established).
after the camera is found, CAVITAR Capture can be started
CAUTION!
If firewall and virus protection settings need to be relaxed in order to enable the
operation of the system, the settings must be restored to the normal settings before
connecting the computer to network.
Содержание C300
Страница 1: ...CAVITAR Welding Camera C300 Operating Manual ...
Страница 14: ...12 Fig 4 2 close all other applications and click Next to start installation Fig 4 3 Click I Agree to continue ...
Страница 30: ...28 Fig 5 16 Guideline and grid properties ...
Страница 34: ...32 Fig 5 21 View after calibration ...