START-UP CHECKLIST — 48TC PACKAGED ROOFTOP UNITS WITH GAS HEAT AND ELECTRIC
COOLING
I. PRELIMINARY INFORMATION
MODEL NO ______________________________________________
JOB NAME _______________________________________________
SERIAL NO ______________________________________________
ADDRESS _______________________________________________
START-UP DATE __________________________________________
TECHNICIAN NAME _______________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (Y/N) _____
Verify that condensate connection is installed per instructions verify that all electrical (Y/N) _____
Connections and terminals are tight (Y/N) _____
Verify gas pressure to unit gas valve is within specified range (Y/N) _____
Check gas piping for leaks (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
Verify that crankcase heaters have been energized for at least 24 hours (Y/N) _____
II. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bulb)
Return-air Temperature
_____________ °F DB
_____________
°
F Wb (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
Gas Heat Supply Air
_____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preceding
sections of this Installation Instruction document.
Содержание WeatherMaker 48TC 04
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 34 48TC B07 Unit with Humidi MiZer Adaptive Dehumidification System Humidistat Wiring ...
Страница 39: ...39 Fig 45 PremierLink Wiring Schematic ...
Страница 40: ...40 Fig 46 PremierLink Wiring Schematic with Humidi MiZer System ...
Страница 48: ...48 Fig 65 Typical RTU Open System Control Wiring Diagram ...
Страница 49: ...49 Fig 66 Typical RTU Open System Control Wiring Diagram with Humidi MiZer System ...