![Carrier WeatherMaker 48TC 04 Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/carrier/weathermaker-48tc-04/weathermaker-48tc-04_installation-instructions-manual_2560312047.webp)
47
Table 29 — Color Code Recommendations
Connect the CCN (+) lead (typically RED) to the unit’s
TB1-12 terminal. Connect the CCN (ground) lead
(typically WHT) to the unit’s TB1-14 terminal. Connect the
CCN (-) lead (typically BLK) to the unit’s TB1-16 terminal.
Fig. 63 — PremierLink CCN Bus Connections
RTU OPEN CONTROL SYSTEM — The RTU Open con-
trol is factory-mounted in the 48TC unit’s main control box, to
the left of the CTB. See Fig. 64. Factory wiring is completed
through harnesses connected to the CTB. Field connections for
RTU Open sensors will be made at the Phoenix connectors on
the RTU Open board. The factory-installed RTU Open control
includes the supply-air temperature (SAT) sensor. The outdoor
air temperature (OAT) sensor is included in the FIOP/accesso-
ry EconoMi$er2 package.
The RTU Open controller is an integrated component of the
Carrier rooftop unit. Its internal application programming pro-
vides optimum performance and energy efficiency. RTU Open
enables the unit to run in 100% stand-alone control mode, Car-
rier’s i-Vu
®
Open network, or a third party building automation
system (BAS). On-board DIP switches allow you to select your
protocol (and baud rate) of choice among the four most popular
protocols in use today: BACnet
1
, Modbus
2
, Johnson N2 and
LonWorks
3
Refer to Table 30, RTU Open Controller Inputs and Outputs
for locations of all connections to the RTU Open board.
Fig. 64 — RTU Open Multi-Protocol Control Board
SIGNAL TYPE
CCN BUS WIRE
COLOR
CCN PLUG PIN
NUMBER
+
Red
1
Ground
White
2
–
Black
3
CCN B
us
J2-1
J2-2
GND (WHT)
12
14
TB1
J2-
3
– (BLK)
16
TB1
TB1
PL
+ (RED)
1. BACnet is a registered trademark of ASHRAE (American
Society of Heating, Refrigerating and Air-Conditioning
Engineers).
2. Modbus is a registered trademark of Schneider Electric.
3. LonWorks is a registered trademark of Echelon Corpora-
tion.
J4
J2
J1
J5
J5
J22
J17
J19
J14
J11
J22
J3
J13
J12
J15
J20
Network Comm
Configurable - Input_8
24 V
A
C
Configurable - Input_5
24 V
A
C
Configurable - Input_3
24 V
A
C
Input_9 (Humidistat)
24 V
A
C
24 V
A
C
Input _8 (Enthalpy)
AO-1 (ECON)
Gnd
(OA
T
)
Gnd
(SA
T
)
Input_5 (SMK)
Input_4
(R)
BO-5
(Y1)
BO-4
(Y2)
BO-3
(W1)
BO-2
(W2)
BO-1
(G)
Gnd
Input_3
(X)
24 V
A
C IN
+24 VDC
Input_2 (CO2/RH)
Gnd
+24 VDC
Input_1 (CO2/RH)
Gnd
Board Power
(AO-1)
0-10VDC
4-20mA
BO-6
(H) Humidimizer
BO-7
(Reversing Valve/High Speed Fan/Y3)
BO-8
(Power Exhaust)
LonWorks
Option Card
Port
Example set for
BACnet MS/TP
and 76.8K baud
(1, 2, and 4 ON)
Recommended for all
i-Vu Open installations
2
N
r
o
,
s
u
b
d
o
M
,
t
e
n
C
A
B
)
t
u
p
n
i
p
m
e
t
(
T
P
S
r
o
t
c
e
l
e
S
l
o
c
o
t
o
r
P
(LON connection J15)
SPT (common)
SPT (offset input)
*Remove
both for 0-5V
AO-2
GND
(2-10V)
3-Volt
Lithium
Battery
BO-1
BO-2
BO-3
BO-4
BO-5
BO-6
BO-7
BO-8
VFD Output
Содержание WeatherMaker 48TC 04
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 34 48TC B07 Unit with Humidi MiZer Adaptive Dehumidification System Humidistat Wiring ...
Страница 39: ...39 Fig 45 PremierLink Wiring Schematic ...
Страница 40: ...40 Fig 46 PremierLink Wiring Schematic with Humidi MiZer System ...
Страница 48: ...48 Fig 65 Typical RTU Open System Control Wiring Diagram ...
Страница 49: ...49 Fig 66 Typical RTU Open System Control Wiring Diagram with Humidi MiZer System ...