Document revision history
VVT Bypass II Controller
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
46
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Change description
Code*
1/2
5
/19
Specifications
Added surge CAUTION to Protection specification.
X-TS-AK-E-CC
12/17/18 Wiring the VVT Bypass II for power > To
wire the controller for power.
Added photograph of lifting up the cover.
X-H-RE-E-CC-JS
Mounting the VVT Bypass II > To mount
the controller and actuator
Added caution stating that you must use the bushing, O-ring, and
screws that are shipped with the VVT Bypass II, along with
applicable graphic.
X-H-RE-E-CC-JS
8/28/18
Wiring the TruVu™ ET Display to the
Rnet port
New topic.
C-D
Specifications
Added TruVu™ ET Display to Rnet port
Added first paragraph to Protection specification.
C-H-JS-O
* For internal use only
Document revision history
Содержание VVT Bypass II
Страница 51: ......