Installing the VVT Bypass II
VVT Bypass II Controller
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
15
To wire the controller to the BACnet network
WARNING
Attaching any ARCNET or MS/TP network to the
Act Net
port damages BT485s, DIAG485s, or
terminating resistors on that network.
1
Pull the screw terminal connector from the controller's power terminals labeled
Gnd
and
24 Vac
.
2
Check the communications wiring for shorts and grounds.
3
Connect the communications wiring to the controller’s screw terminals labeled
Net +
,
Net -
, and
Shield
.
NOTE
Use the same polarity throughout the network segment.
4
Set the communication type and baud rate.
For...
Set BACnet ARC156 or MS/TP
jumper to...
Set DIP switches 1 and 2 to...
ARC156
ARC156
N/A. Baud rate will be 156 kbps regardless of the
DIP switch settings.
MS/TP
MS/TP
The appropriate baud rate. See the
MS/TP Baud
diagram on the controller.
NOTE
Use the same baud rate for all controllers on the network segment.
5
If the VVT Bypass II is at either end of a network segment, connect a BT485 to the VVT Bypass II.
6
Insert the power screw terminal connector into the VVT Bypass II's power terminals.
7
Verify communication with the network by viewing a Module Status report in the i-Vu® interface.
Содержание VVT Bypass II
Страница 51: ......