2.6.5 Pressure transducers
Pressure transducers are used to measure and control the pressures in the unit. These electronic sensors deliver
0 to 5 VDC. The transducers can be calibrated through the controller. The pressure transducers are connected to
the IOBs.
Wiring information (see chiller wiring diagram)
Pressure transducer type
Pressure sensor
Point Name Designation
#IOB
#
Channel
# Block
#
Terminal
5VDC
– low refr. Pressure range
Condenser pressure
COND_P
BP1
IOB 1
AI7
J15
4-10
5VDC
– low refr. Pressure range
Evaporator pressure
EVAP_P
BP3
IOB 1
AI8
J15
3-9
5VDC
– low refr. Pressure range
Pump Outlet Pressure
PUMPO_P
BP81
IOB 2
AI5
J15
6-12
5VDC
– low refr. Pressure range
Bearing Outlet
pressure
BRGO_P
BP71
IOB 2
AI6
J15
5-11
5VDC
– low refr. Pressure range
Bearing inlet pressure
BRGI_P
BP70
IOB 2
AI7
J15
4-10
5VDC
– low refr. Pressure range
Pump inlet Pressure
PUMPI_P
BP80
IOB 2
AI10
J15
1-7
5VDC
– low refr. Pressure range
Entering Evap water
pressure
EVAP_EWP
BP13
IOB 4
AI3
J16
3-7
5VDC
– water side pressure range
Leaving Evap water
pressure
EVAP_LWP
BP12
IOB 4
AI4
J16
4-8
5VDC
– water side pressure range
Entering Cond water
pressure
COND_EWP
BP15
IOB 4
AI5
J15
6-12
5VDC
– water side pressure range
Leaving Cond water
pressure
COND_LWP
BP14
IOB 4
AI6
J15
5-11
5VDC
– water side pressure range
Table 1b
– Pressure sensors
3.
INSTALLATION
3.1 Introduction
The 19DV machines are factory assembled, wired, leak tested and electrically tested. Installation (not by Carrier)
consists primarily of establishing water and electrical services to the machine. The rigging, installation, field wiring,
field piping, and insulation of waterbox covers are the responsibility of the contractor and/or customer.
3.2 Step 1
– Receive the machine
3.2.1
– Inspect the product delivered
CAUTION: Do not open any valves or loosen any connections. The standard 19DV machine is shipped with a full
refrigerant charge. Some machines may be shipped with a nitrogen holding charge as an option. Damage to
machine may result.
1.
Inspect for shipping damage while machine is still on shipping conveyance. If machine appears to be
damaged or has been torn loose from its anchorage, have it examined by transportation inspectors before
removal. Forward claim papers directly to transportation company. Manufacturer is not responsible for any
damage incurred in transit.
2.
Check all items against shipping list. Immediately notify the nearest Carrier representative if any item is
missing.
3.
To prevent loss or damage (standard EN 378-2 11.22 k, annex A and B), leave all parts in original packages
until beginning installation. All openings are closed with covers or plugs to prevent dirt and debris from
entering machine components during shipping. A full operating inhibitor charge is placed in the
lubrication assembly before shipment. from the factory. Do not open lube assembly valves until unit is fully
charged with refrigerant.
3.2.2
– Identify machine
Confirm that the unit received is the one ordered. Compare the name plate data with the order. The unit name
plate must include the following information:
-- Service number
-- Serial number
-- Model number
-- Variant
-- Year of manufacture and test date
-- CE marking
Содержание PIC 5+
Страница 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Страница 52: ...52 Fig 24 19DV control box ...
Страница 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Страница 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Страница 57: ...57 ...
Страница 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Страница 114: ...114 Detailed menu description ...
Страница 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...