13
1. Interconnecting Compressor Piping (ICP) from 1
st
stage to 2
nd
stage
2. VFD cooling piping
3. Condenser
4. Condenser waterbox nozzles
5. Economizer isolation valve (option)
6. Economizer
7. Evaporator waterbox nozzles
8. Evaporator
9. PIC5+ HMI touchscreen panel
10. Suction elbow
11. Evaporator sightglass
12. Evaporator charging valve
13. Evaporator pressure transducer
14. 1
st
stage Inlet Guide Vane (IGV) actuator
15. Compressor
16. Motor terminal box
17. Power cables from VFD to compressor motor
18. 2
nd
stage Inlet Guide Vane (IGV) actuator
19. Economizer pipe
20. Condenser relief valve assy
21. Evaporator relief valve assy
Содержание PIC 5+
Страница 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Страница 52: ...52 Fig 24 19DV control box ...
Страница 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Страница 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Страница 57: ...57 ...
Страница 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Страница 114: ...114 Detailed menu description ...
Страница 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...