![Carrier 50TCQD Скачать руководство пользователя страница 52](http://html.mh-extra.com/html/carrier/50tcqd/50tcqd_installation-instructions-manual_2563350052.webp)
52
Table 27 – RTU Open Controller Inputs and Outputs
POINT NAME
BACnet OBJECT
NAME
TYPE OF I/O
CONNECTION
PIN NUMBER(S)
CHANNEL DESIGNATION
DEDICATED INPUTS
Space Temp / Zone Temp
zone_temp
AI (10K Thermistor)
J20--- 1 and 2
Analog Input 10
Supply Air Temperature
sa_temp
AI (10K Thermistor)
J2--- 1 and 2
Analog Input 6
Outside Air Temperature
oa_temp
AI (10K Thermistor)
J2--- 3 and 4
Analog Input 7
Space Temperature Offset Pot
stpt_adj_offset
AI (100K Potentiometer)
J20--- 3 and 4
Analog Input 11
Safety Chain Feedback
safety_status
BI (24 VAC)
J1--- 9
Binary Input 4
Compressor Safety Status
(1)
comp_status
BI (24 VAC)
J1--- 2
Binary Input 3
Fire Shutdown Status
firedown_status
BI (24 VAC)
J1--- 10
Binary Input 5
Enthalpy Status
enthalpy_status
BI (24 VAC)
J2--- 6 and 7
Binary Input 8
Humidistat Input Status
humstat_status
BI (24 VAC)
J5--- 7 and 8
Binary Input 9
Zone Temperature
n/a
n/a
J13--- 1--- 4
Rnet
CONFIGURABLE INPUTS
(4)
Indoor Air CO2
iaq
AI (4--- 20 mA)
J4---2 and 3 or J4---5 and 6
Analog Input 2
Outdoor Air CO2
oaq
AI (4--- 20 mA)
Analog Input 1
Space Relative Humidity
space_rh
AI (4--- 20 mA)
Analog Input 10
Supply Fan Status
(2)
sfan_status
BI (24 VAC)
J5---1 and 2 or J5---3 and 4,
J5---5 and 6 or J5---7 and 8
(3)
Binary Input 3, 5, 8, or 9, except where intrinsic input is used
Filter Status
(2)
filter_status
BI (24 VAC)
Binary Input 3, 5, 8, or 9, except where intrinsic input is used
Door Contact
(2)
door_contact_status
BI (24 VAC)
Binary Input 3, 5, 8, or 9, except where intrinsic input is used
Remote Occupancy input
(2)
occ_contact_status
BI (24 VAC)
Binary Input 3, 5, 8, or 9, except where intrinsic input is used
IGC input
(2)
igcovr_status
BI (24 VAC)
Binary Input 9. Mandatory input on gas heat units.
OUTPUTS
Economizer Output
econ_output
AO (4--- 20mA)
J2--- 5
Analog Output 1
Supply Fan VFD
vfd_output
AO (2--- 10Vdc)
J22--- 1 and 2
Analog Output 2
Supply Fan Relay
sfan
BO Relay (24VAC, 1A)
J1--- 4
Binary Output 1 (G)
Cool 1 Relay State
comp_1
BO Relay (24VAC, 1A)
J1--- 8
Binary Output 5 (Y1)
Cool 2 Relay State
comp_2
BO Relay (24VAC, 1A)
J1--- 7
Binary Output 4 (Y2)
Cool 3 Relay State
comp_3
BO Relay (24VAC, 1A)
J11--- 5 and 6
Binary Output 7 (Y3)
Heat 1 Relay State
heat_1
BO Relay (24VAC, 1A)
J1--- 6
Binary Output 3 (W1)
Heat 2 Relay State
heat_2
BO Relay (24VAC, 1A)
J1--- 5
Binary Output 2 (W2)
Power Exhaust Relay State
pexh
BO Relay (24VAC, 1A)
J11--- 2 and 3 (N.O.)
Binary Output 8 (PE)
Dehumidification Relay
dehum
BO Relay (24VAC, 1A)
J11--- 7 and 8 (N.O.)
Binary Output 6
LEGEND
AI
---
Analog Input
AO
---
Analog Output
BI
---
Binary Input
BO
---
Binary Output
(1)
Safety Chain Feedback: 24 vac required at this terminal to provide “Run Enable” status. See Input/Output section for additional instructions.
(2)
These inputs are configurable. If installed, they take the place of the default input on the specific channel. See appropriate Input Configuration Section for wiring and setup instructions.
(3)
Parallel pins J5--- 1 = J2--- 6, J5--- 3 = J1--- 10, J5--- 5 = J1--- 2 are used for field--- installation.
(4)
Refer to the input configuration and accessory sections of the
RTU Open Multi---Protocol Controller Controls, Start ---Up, Operation and Troubleshooting
manual for more detail.
The RTU Open controller requires the use of a Carrier
space sensor. A standard thermostat cannot be used with
the RTU Open controller system.
Supply Air Temperature (SAT) Sensor —
On FIOP--equipped 50TCQ unit, the unit is supplied with a
supply--air temperature (SAT) sensor (33ZCSENSAT). This
sensor is a tubular probe type, approx 6--inches (152 mm) in
length. It is a nominal 10--k ohm thermistor.
The SAT is factory--wired. The SAT probe is wire--tied to
the supply--air opening (on the horizontal opening end) in
its shipping position. Remove the sensor for installation.
Re--position the sensor in the flange of the supply--air
opening or in the supply air duct (as required by local
codes). Drill or punch a
1
/
2
--in. hole in the flange or duct.
Use two field--supplied, self--drilling screws to secure the
sensor probe in a horizontal orientation. See Fig. 49.
Outdoor Air Temperature (OAT) Sensor —
The OAT is factory--mounted in the EconoMi$er
R
2 (FIOP
or accessory). It is a nominal 10k ohm thermistor attached
to an eyelet mounting ring.
EconoMi$er2 —
The RTU Open controller is used with EconoMi$er2
(option or accessory) for outdoor air management. The
damper position is controlled directly by the RTU Open
controller; the EconoMi$er2 unit has no internal logic
device.
Outdoor air management functions can be enhanced with
field--installation of these accessory control devices:
Enthalpy control (outdoor air or differential sensors)
Space CO
2
sensor
Outdoor air CO
2
sensor
Field Connections
Field connections for accessory sensors and input devices
are made the RTU Open controller, at plugs J1, J2, J4, J5,
J11 and J20. All field control wiring that connects to the
RTU Open controller must be routed as shown in Fig. 38.
This routing provides the UL required clearance between
high-- and low--voltage wiring. Connect to the wires to the
removable PCB connectors and then reconnect the
connectors to the board.
Содержание 50TCQD
Страница 5: ...5 C14192 Fig 2 Unit Dimensional Drawing 14 Size Unit ...
Страница 6: ...6 C14193 Fig 2 Unit Dimensional Drawing 14 Size Unit cont ...
Страница 10: ...10 C10365 Fig 6 Roof Curb Details ...
Страница 17: ...17 a50 9707 Fig 26 Typical 50TCQ Control Wiring Diagram ...
Страница 18: ...18 a50 9708 Fig 27 Typical 50TCQ Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Страница 43: ...43 a50 9710 Fig 50 PremierLinkt Controller Wiring Schematic ...
Страница 51: ...51 a50 9711 Fig 66 RTU Open Controller System Wiring Diagram ...