DETAIL “A”
SEE DETAIL “A”
914 - 1371
( 36” - 54” )
“B”
“A”
“C”
PLACE ALL GASKET IN PLACE BEFORE PLACING
UNIT ON ROOF CURB.
DUCT END
C10281
UNIT
MAX WEIGHT
DIMENSIONS
A
B
C
LB
KG
IN
MM
IN
MM
IN
MM
50TCQD14
2015
916
116.0
2945
55.5
1410
59.5
1510
NOTES
:
1. Dimensions in ( ) are in millimeters.
2. Hook rigging shackles through holes in base rail, as shown in detail “A.” Holes in base rails are centered around the
unit center of gravity. Use wooden top to prevent rigging straps from damaging unit.
Fig. 9 -- Rigging Details
If the alternative condensate drain location through the
bottom of the unit is used in conjunction with a retrofit curb,
the hole in the curb must be moved 12
1
/
2
in (320 mm)
towards the end of the unit.
Although unit is weatherproof, guard against water from
higher level runoff and overhangs.
Remove all shipping materials and top skid. Remove extra
center post from the condenser end of the unit so that the
condenser end of the unit matches Fig. 19 -- 21. Recycle
or dispose of all shipping materials.
Step 7 — Convert to Horizontal and Connect
Ductwork (when required)
Unit is shipped in the vertical duct configuration. Unit
without
factory--installed economizer or return air smoke
detector option may be field--converted to horizontal ducted
configuration using accessory CRDUCTCV001A00. To
convert to horizontal configuration, remove screws from side
duct opening covers and remove covers.
Discard the supply duct cover. Install accessory
CRDUCTCV001A00 to cover the vertical supply duct
opening. Use the return duct cover removed from the end
panel to cover the vertical return duct opening.
Field--supplied flanges should be attached to horizontal
duct openings and all ductwork should be secured to the
flanges. Insulate and weatherproof all external ductwork,
joints, and roof or building openings with counter flashing
and mastic in accordance with applicable codes.
Do not cover or obscure visibility to the unit’s informative
data plate when insulating horizontal ductwork.
C06108
Fig. 10 -- Horizontal Conversion Panels
Step 8 — Install Outside Air Hood
Economizer Hood Removal and Setup --
Factory Option —
1. The hood is shipped in knock--down form and located
in the return air compartment. It is attached to the
economizer using two plastic tie--wraps.
2. To gain access to the hood, remove the filter access
panel. (See Fig. 11.)
3. Locate and cut the (2) plastic tie--wraps, being careful
to not damage any wiring. (See Fig. 12.)
4. Carefully lift the hood assembly through the filter
access opening and assemble per the steps outlined in
Economizer Hood and Two–Position Hood
on page 13.
Содержание 50TCQD
Страница 5: ...5 C14192 Fig 2 Unit Dimensional Drawing 14 Size Unit ...
Страница 6: ...6 C14193 Fig 2 Unit Dimensional Drawing 14 Size Unit cont ...
Страница 10: ...10 C10365 Fig 6 Roof Curb Details ...
Страница 17: ...17 a50 9707 Fig 26 Typical 50TCQ Control Wiring Diagram ...
Страница 18: ...18 a50 9708 Fig 27 Typical 50TCQ Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Страница 43: ...43 a50 9710 Fig 50 PremierLinkt Controller Wiring Schematic ...
Страница 51: ...51 a50 9711 Fig 66 RTU Open Controller System Wiring Diagram ...