
23
Table 5 – 50TCQ Defrost Board I/O and Jumper Configurations
Inputs
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
G Fan
DI, 24Vac
P2---3
CTB---G
Y1 Cool 1
DI, 24Vac
P2---5
CTB---Y1
Y2 Cool 2
DI, 24Vac
P2---4
CTB---Y2
W1 Heat 1
DI, 24Vac
P2---7
CTB---W1
W2 Heat 2
DI, 24Vac
P2---6
CTB---W2
R Power
24Vac
P3---1
CONTL BRD---8
C Common
24Vac
P3---2
CONTL BRD---4
DFT1
DI, 24Vac
DFT---1 to DFT---1
—
DFT 2
DI, 24Vac
DFT---2 to DFT---2
—
Outputs
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
IFO Fan On
DO, 24Vac
P3---9
REHEAT/HP---2
OF OD Fan On
DO, 24Vac
OF
OFR
RVS1
DO, 24Vac
P3---7 to P3---5
—
Energize in COOL
RVS2
DO, 24Vac
P3---6 to P3---4
—
Energize in COOL
COMP 1
DO, 24Vac
P3---10
FPT1 --- REHEAT/HP---6
COMP 2
DO, 24Vac
P3---8
FPT2 --- REHEAT/HP---8
HEAT 2
DO, 24Vac
E---HEAT
TB4---1
COM
24Vac
P3---3
TB4---3
Configuration
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
Select Jumper
24Vac
P1---1
—
2 Compressor
24Vac
P1---3
—
Use for 50TCQD
Speed--Up Configuration
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
Speed---Up Jumper
—
JMP17
—
Speed---Up Jumper
—
JMP18
—
Jumper for 1---3 seconds: Factory Test — The defrost interval timing is reduced by a factor of 0.1 seconds/minute based on the positions of
DIP switches SW1 and SW2 (i.e. 90 minutes will be reduced to 9 seconds).
Jumper for 5---20 seconds: Forced Defrost — Defrost runs for 30 seconds if DFT2 is open.
a50_9709
Fig. 36 -- Defrost Control Board Location
Table 6 – DIP Switch Position
Switch No.
1
2
1
2
1
2
1
2
3
1
J
1
J
1
1
J
J
1
J
On
0
J
0
J
0
J
J
0
0
Off
30 minutes
60 minutes
(Factory default)
90 minutes
120 minutes
Fan Delay
Содержание 50TCQD
Страница 5: ...5 C14192 Fig 2 Unit Dimensional Drawing 14 Size Unit ...
Страница 6: ...6 C14193 Fig 2 Unit Dimensional Drawing 14 Size Unit cont ...
Страница 10: ...10 C10365 Fig 6 Roof Curb Details ...
Страница 17: ...17 a50 9707 Fig 26 Typical 50TCQ Control Wiring Diagram ...
Страница 18: ...18 a50 9708 Fig 27 Typical 50TCQ Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Страница 43: ...43 a50 9710 Fig 50 PremierLinkt Controller Wiring Schematic ...
Страница 51: ...51 a50 9711 Fig 66 RTU Open Controller System Wiring Diagram ...