4.5 Cable runs
The Merlin LT system employs a simple cable arrangement: see section 3.2. As with any marine cable run, good
practice is needed to ensure a successful installation.
Ensure all cables are securely connected to the back of the Merlin LT. All connectors are unique so cannot be
plugged into the wrong socket.
Ensure that all cables are secured in a safe manner along their entire length. Use cable ties or cable clips to keep
them from obstructing walkways, doorways and emergency access points.
All cable runs should be protected as much as possible. The cables should be adequately secured and supported
to ensure there is no free movement or damage to the cables.
Where there is enough cable, service loops should be left at both ends of each cable to allow for future work and/or
relocation.
PPS
Connected to
device outputting
timing pulse
Power
Connected to
12 V dc power
source
Ethernet
Connected to onboard
nav computer
Serial
Connected to
device outputting
ZDA
Figure 21 Merlin LT showing input sources
Содержание Merlin LT
Страница 1: ...Merlin LT user manual H 0218 8000 01 B January 2020 Merlin LT Vessel based LIDAR system user manual...
Страница 2: ......
Страница 48: ...P a g e 48 Figure 41 Status Running GPS Figure 42 Status Running synched no GPS...
Страница 53: ...P a g e 53 9 Mechanical drawings 9 1 Merlin LT positioned at 90 vertical angle All dimensions in millimetres...
Страница 54: ...P a g e 54 9 2 Merlin LT positioned at 0 vertical angle All dimensions in millimetres...