Note 2:
6 Amp Relay Rating
Maximum current that can be switched reliably when connected to a ‘non-inductive load’ up to
30VDC. Electric strikes and magnetic locks are considered ‘inductive loads’. It is important to
have diode or MOV attached at the locking device to remove the CEMF pulse that is generated
when switching an ‘inductive load’. It is advisable to use a 50% switch factor or 3 amps as the
maximum switching current for longer relay life. An external relay should be used on larger
voltage and current requirements
.
MAP1 SYSTEM INDICATORS
POWER LED
: ON indicates 12 volts DC is connected.
MEBR LED, MEBT LED
: For future use.
First Access Mode
:
Mode indicator: MAP1 emits 1 beep after powered up.
PM1 LED
: ON,
PM2 LED
: OFF
Webster Mode
:
Mode indicator: MAP1 emits 2 beeps after powered up.
PM1 LED
: ON,
PM2 LED
: OFF
Cloud Lock Mode
:
Mode indicator: MAP1 emits 3 beeps after powered up.
PM1 LED
: ON,
PM2 LED
: OFF
IOM LED
: Flashing RED – IOM (Input Output Module) is in normal operation.
PLM LED
:
Flashing GREEN – PLM (Panel Logic Module) is waiting for a connection from
the host via Ethernet.
ON GREEN – PLM (Panel Logic Module) is connected to a host via Ethernet.
IMPORTANT:
In some jurisdictions, the use of a UL approved power supply and
connection to the fire alarm system for emergency release may be required. Installers
should contact the local authority having jurisdiction to verify the specific
requirements. Also, a building permit may be required in some jurisdictions for the
installation of magnetic locks.
Note
:
PM1 and PM2
LED will occasionally
and rapidly toggle ON
and OFF when host
communication is in
progress
.
Содержание MAP1
Страница 1: ...MAP1 Controller INSTALLATION MANUAL June 2018...
Страница 7: ...MAP1 Page 7 of 31 Installation Manual June 2018 Rev 1 6 MAP1 Controller Layout Figure 1...
Страница 13: ...MAP1 Page 13 of 31 Installation Manual June 2018 Rev 1 6 Figure 6 Non Supervised...
Страница 14: ...MAP1 Page 14 of 31 Installation Manual June 2018 Rev 1 6 Figure 7 Supervised...
Страница 17: ...MAP1 Page 17 of 31 Installation Manual June 2018 Rev 1 6 INPUT AND OUTPUT POINT WIRING General Layout Figure 10...