E. Basic Sequence of Operations
Two
consecutive prints on
A4 paper (Cassette
feed)
Figure 2-6
Table 2-l
Remark
WAIT
From power-ON until the
To warm up
roller to
period. the
roller temperature reaches 175°C
put the printer in the standby
printer checks the car-
period)
See page l-3 for warm-up
state and clean the transfer
Is installed and
charging roller.
there is toner it.
STBY
From end of the WAIT
To hold the
roller at
If the
printer stays in
a
signal is Input from
175°C to keep the printer
standby state for
the video controller.
from the
ready to print.
hours more. It
end of
period until a
the
motor for one
signal is
Input from the
second to rotate the
video controller the power is
roller, that the
switched OFF
roller will not be
deformed.
After the
signal has been
To stabilize the sensitivity of
input from the video controller
the drum In preparation for
ROTATIONS
the scanner motor becomes
and to clean the
ready (about 6 seconds)
transfer charging roller.
From the end of the
period
To form an image on the
this period. the
until the primary voltage (DC)
drum according printer holds the
switches OFF
to the
from
roller at 190°C.
the video controller and to
transfer the image the paper.
After the primary voltage
turns OFF
main motor
ROTATIONS stops
period)
To deliver the
of the
If a
signal is
Job and to clean the transfer
from the
controller,
charging roller.
the INITIAL ROTATIONS
period
Содержание LBP-1260
Страница 1: ...LBP 1260 SERVICE MANUAL Canon...
Страница 35: ...l 29...
Страница 36: ...CNAPTER 1 1 30...
Страница 63: ...CHAPTER 2 This page intentionally left blank 2 26...
Страница 88: ......
Страница 139: ......
Страница 153: ...ER 6 This page intentionally left blank 6 7...
Страница 157: ...CHAPTER 6 o r J20 J215 I u IC201 El IC202 TB201 J214 J213 Fi m 6 7 6 11...
Страница 193: ...This page intentionally left blank 6 4 7...
Страница 194: ...CHAPTER 6 A Switches 1 I Figure 11 6 46...
Страница 196: ...B Sensore and Sotenoids Flgurc 6 12 6 50...
Страница 198: ...CHAPTER 6 C Motors and Others Figure 6 13 6 52...
Страница 200: ...CEtApTER 6 D PC Boards Figure 6 14 6 54...
Страница 202: ...E Connectors Figure 6 16 6 56...
Страница 203: ...Figure 6 16 6 57...
Страница 210: ...no VIDEO si ml VS Q VERTICAL SYNC REQUEZT signal VSYNC VERTICAI SYNC A 4...
Страница 212: ...IV DC CONTROLLER DC controller 112 fi 6 4 3 I 2 I 1 A 6...
Страница 213: ...DC controller 2 2 iy j A 7...
Страница 215: ...Pick up motor driver 2 2 SENSOR PCB J602 0 A pA J602 bB1 pA J602 om pB I 24UA IPlO 1 SD A 9...
Страница 216: ...D I R 7...
Страница 217: ...VII PAPER FEEDER DRIVER 3 I 1 A 11...