Subsection XX (ENGINE REMOVAL AND INSTALLATION)
PROCEDURES
ENGINE REMOVAL
1. Place vehicle on a workstation equipped with
an engine-lifting hoist.
2. Disconnect negative (-) cable from battery.
3. Carry out the following operations. Refer to ta-
ble.
OPERATIONS
REFERENCES
(SUBSECTION)
Safely lift and support
the vehicle
INTRODUCTION
Release fuel pressure
FUEL TANK AND
FUEL PUMP
Drain engine coolant
PERIODIC
MAINTENANCE
PROCEDURES
Remove front body module
Remove RH footrest panel
BODY
Remove air filter housing
AIR INTAKE SYSTEM
Remove muffler
Remove exhaust pipes
EXHAUST SYSTEM
Remove CVT air inlet
Remove CVT air outlet
CONTINUOUSLY
VARIABLE
TRANSMISSION (CVT)
Disconnect positive (+)
starter cable
STARTING SYSTEM
Disconnect TPS connector
Disconnect MAPTS
connector
ELECTRONIC FUEL
INJECTION (EFI)
Remove intake manifold
INTAKE MANIFOLD
Remove spark plug cables
IGNITION SYSTEM
4. Remove RH footrest support.
vmr2012-009-003_a
TYPICAL - OUTLANDER SHOWN
1. RH footrest support
5. Move throttle body aside to make room.
vmr2012-009-001
TYPICAL - THROTTLE BODY ATTACHED ON FRAME
6. Move master cylinder aside to make room.
vmr2012-009-002
TYPICAL - MASTER CYLINDER ATTACHED ON REAR FENDER
7. Move crankcase vent hose as illustrated.
2
vmr2013-009