Rotation schedule adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Standard rotation schedule is
based on equalizing run time
on a 1-hour schedule
•
To vary the rotation to a fixed
schedule based on (hours,
days)
1)
Press
and
2)
Press
[Lead Lag Master Configuration]
3)
Press
[Advanced Settings >]
4)
Press the to arrive at
Algorithms
5)
Select
Lead selection method: Sequence order
6)
Select
Lag selection method: Sequence order
7)
Select
Lead rotation time: (user defined)
Base load rate adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the lead
boiler will fire up to the
specified base load rate
(80%). If the temperature is
not within Error threshold
(5
o
F) of setpoint after
Interstage delay (2 minutes) a
lag boiler will be brought
online and will also fire up to
the base load rate specified.
•
Modulation of boilers will
only occur after all boilers in
the Lead Lag system are firing
up to the specified base load
rate (80%).
1)
Press
and
2)
Press
[Lead Lag Master Configuration]
3)
Press
[Advanced Settings >]
4)
Press the to arrive at
Rate Allocation
5)
Select
Base load common: (user defined)
Содержание DFH/W1100
Страница 2: ......
Страница 40: ...35...
Страница 71: ...66 PART 12 EXPLODED VIEW...
Страница 72: ...67 3 44 10 45 46 47 28 31 26 52 57 58 59 54 60 61 SOLA Control Panel 39 4...
Страница 82: ...77 PART 13 ELECTRICAL DIAGRAMS...
Страница 83: ...78...
Страница 85: ...80...
Страница 86: ...81...
Страница 87: ...82...