![Camus Hydronics DFH/W1100 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/camus-hydronics/dfh-w1100/dfh-w1100_installation-operation-and-service-manual_490905043.webp)
38
The following steps are performed at the factory and verifying on site will
be sufficient:
6)
Select
Pump Configuration
7)
Press
[Advanced Options >>]
8)
Press the to arrive at
Central Heat Pump
or
DHW Pump
9)
On Options: Local burner demand
10)
On Options: Local Lead Lag Service Active
11)
Force On: Outlet high limit
Master Boiler, System Sensor
Description
Electrical Connection(s)
Programming Instructions
•
Master boiler system sensor
configuration
1)
Press
and
2)
Press
[Sensor Configuration]
3)
Select
S5 (J8-11) Sensor
4)
Connector Type:
10K NTC Single Non-Safety
5)
The control will proceed into a Lockout 2 condition
6)
Press
[Verify]
>
[Begin]
>
[Yes]
7)
Press the reset button on the ignition control within the alotted time
Содержание DFH/W1100
Страница 2: ......
Страница 40: ...35...
Страница 71: ...66 PART 12 EXPLODED VIEW...
Страница 72: ...67 3 44 10 45 46 47 28 31 26 52 57 58 59 54 60 61 SOLA Control Panel 39 4...
Страница 82: ...77 PART 13 ELECTRICAL DIAGRAMS...
Страница 83: ...78...
Страница 85: ...80...
Страница 86: ...81...
Страница 87: ...82...