![Camus Hydronics DFH/W1100 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/camus-hydronics/dfh-w1100/dfh-w1100_installation-operation-and-service-manual_490905041.webp)
36
DF(H,W) Lead Lag Operation
Master Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Master boiler lead lag setup
1)
Press
and
2)
Select
System Identification & Access
3)
Verify
MB1 Modbus address
= 1
4)
Verify
MB2 Modbus address
= 1
5)
Select
Lead Lag Master Configuration
6)
Select
Master Enabled = Enabled
Fixed Setpoint operation
7)
Enter
CH
Setpoint
(Fixed setpoint)
4-20mA/ 0-10Vdc setpoint operation
8)
Select
[Advanced Settings >]
9)
Press the to arrive at
Central Heat
10)
Select
Setpoint Source = S2 (J8-6) 4-20mA
11)
Select
4mA water temperature
12)
Select
20mA water temperature
13)
Select
Lead Lag Slave Configuration
14)
Select
Slave enabled = Enable slave for built-in Lead Lag master
Содержание DFH/W1100
Страница 2: ......
Страница 40: ...35...
Страница 71: ...66 PART 12 EXPLODED VIEW...
Страница 72: ...67 3 44 10 45 46 47 28 31 26 52 57 58 59 54 60 61 SOLA Control Panel 39 4...
Страница 82: ...77 PART 13 ELECTRICAL DIAGRAMS...
Страница 83: ...78...
Страница 85: ...80...
Страница 86: ...81...
Страница 87: ...82...