P
age
10
- Manual
FA01556-EN
- 07/2021 - © C
AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T
ranslation of the o
riginal instructions
Fit the anchoring plate in the iron cage.
The tubes must pass through the existing holes.
Cast cement into the foundation frame.
The plate must be perfectly level and the screw threads completely above surface.
Wait at least 24 hours for the cement to dry.
Remove the foundation frame.
Fill the hole with soil around the concrete block.
Remove the nuts from the screws.
Thread the electrical cables into the tubes so that they protrude by about 1500 mm.
Preparing the barrier
With the cover open, the operator does not work.
1
2
3
4