ACCESSORY WIRING
CM9-2 INSTALL ATION AND OWNER MANUAL V.3.1 | 2023.06.01
PAGE 32
Backup Battery
24V batteries are added to the battery compartment at the bottom of the gate operator. There is a separate
battery circuit board that connects to the BAT input on the main gate operator circuit board.
Batteries degrade over time depending on usage. Battery performance may decrease in extremely cold
temperatures - performance can be increased by adding insulation to the inside of the gate operator battery
compartment or adding a heater. The batteries should be replaced every 3-4 years.
Solar Panel
Solar Panels can be wired into the 24VDC SOLAR input on the gate operator circuit board.
Multiple solar panels may be wired together to charge the battery faster. we recommend two 24VDC solar
panels for optimal charging.
Place solar panel at a 45 degree angle, facing SOUTH.
Note: optimal angle and orientation may vary based on our location and season.
Make sure the solar panel can receive direct sunlight. If a tree, or other forms of shade blocks the solar
panel, move the solar panel to a different location.