This setup is for dual swing gate. A single button press of the remote control can open both gates. This
requires two (2) gate operators. One gate operator is the “PRIMARY”, and the other is the “SECONDARY”.
All accessories including remote controls, photocell sensor, loop detectors, etc. must be installed/programed
on the “PRIMARY” gate operator only. Only one photocell sensor is required, and duo photocell sensor is
optional.
1. On the “SECONDARY” gate operator circuit board, set dip switch number 5 to on (FIGURE A).
2. Press the reset button on the “SECONDARY” gate operator circuit board.
3. A 18 - 222 gauge, 2 conductor, stranded, copper, electrical wire is required.
4. Locate the DATA - and DATA + green terminal on the bottom left of the circuit board (FIGURE B). Use a
flathead screwdriver to relase the 2 locks on the top on the green terminal.
5. Using the electrical wire, connect the DATA + on the primary gate opener, to the DATA + on the secondary
gate opener. Connect the DATA - on the primary gate opener to the DATA - on the secondary gate opener.
The M/S link LED light should now be lit on both ciruit boards.
6. Use a flathead screwdriver to close the two locks on the top of the green terminal.
7. Place the cable underground in an eletrical conduit. This conduit must be separate from the main 110 -
120V AC electricity conduit.
DUAL GATE WIRING AND SETUP
CM9-2 INSTALL ATION AND OWNER MANUAL V.3.1 | 2023.06.01
PAGE 17
OFF
ON
DP
ON
FIGURE A
FIGURE B
D
ATA
-
D
ATA
+
D
ATA
-
D
ATA
+
Electrical Conduit