iL Series User Manual
California Instruments
Rev B
59
Figure 19 Verification and Calibration Test Setup
Note: Connect and program each phase individually. Never connect more
than one phase at a time.
Note: When performing the verification tests from an IEEE-488 controller,
you may have to consider the relatively slow settling times and slew
rates of the AC source as compared to computer and system
voltmeters. Suitable WAIT statements can be inserted into the test
program to give the AC source time to respond to the test commands.
6.2 Operation Verification
Perform the following tests for operation verification in the order indicated.
1. Turn-On Checkout
2. Voltage Programming and Readback Accuracy
3. Current Readback Accuracy
6.2.1 Turn-On Checkout
Perform the Turn-On Checkout as directed in section 3. The AC source must pass
turn-on selftest before you can proceed with the other verification tests.
6.2.2 Voltage Programming and Readback Accuracy
This test verifies the voltage programming, IEEE-488 readback, and front panel
meter functions. Values read back over the IEEE-488 should be the same as those
displayed on the front panel.
Figure 19 shows the setup for the tests. Measure the output voltage directly at the
sense connections of the output terminals.
Содержание 3000iL
Страница 9: ...iL Series User Manual California Instruments Rev B ix page intentionally left blank...
Страница 10: ......
Страница 37: ...iL Series User Manual California Instruments Rev B 27...
Страница 84: ...iL Series User Manual 74 Rev B California Instruments Figure 21 Troubleshooting Diagram for No Output Present...
Страница 89: ...iL Series User Manual California Instruments Rev B 79 Figure 23 AC Power Source Block Diagram...
Страница 93: ...iL Series User Manual California Instruments Rev B 83 Figure 25 AC Input Board Parts Location...
Страница 94: ...iL Series User Manual 84 Rev B California Instruments Figure 26 Mother Board Parts Location...