EXAECO
®
HIGH EFFICIENCY RECOVERY UNIT
OPERATING AND COMMISSIONING INSTRUCTIONS
MS-CDF-002
Ind D
Maj. 02/11/2018
Créé par : JC
Validé par : AR
Page 5/49
II. INSTALLATION
II.1. Handling
The units must only be moved in their installation position.
If the device is handled using a fork-lift truck, ensure this supports the load-bearing structure.
If the device is moved using a crane, use four cables of identical lengths. These must be at least as long as the greatest distance
between two fastening points.
II.1. Space required
In general, it is desirable to have an access space at least equal to the dimension B for maintenance.