EXAECO
®
HIGH EFFICIENCY RECOVERY UNIT
OPERATING AND COMMISSIONING INSTRUCTIONS
MS-CDF-002
Ind D
Maj. 02/11/2018
Créé par : JC
Validé par : AR
Page 6/49
II.2. Setting up
The unit must be laid on a sufficiently rigid and flat surface (use vibration mounts if necessary). For the HVAC connection,
select duct sections based on dimensions of the flexible bands that should be properly stretched
he ducts should be insulated
and the first accessories should be at 2.5 times the diameter (Tee elbow ...)
. Install the unit such that bad weather or ambient
temperature cannot damage the internal items of the unit during installation as well as when used later
Provide a siphon on each condensate drainage pipe
. A siphon can only be used for one drainage system.
Note: the siphon must be connected in accordance with Best Practices in order that the condensates are
removed as efficiently as possible
.
The height H must be at least equal to the maximum internal negative pressure of the unit (Dp in mm).
Example : Dp = 500 Pa @ 50 mm CE
H > 50 mm
2H > 100 mm
The unit placed outside must always be fixed to the floor of the support frame, so that it can not move or fall (take into account
the force of the wind). Also provide a roof (DPE) as well as awnings rain (AGE) if necessary (optional).
II.2.a. Connection of separate modules
The connecting brackets between boxes are prefixed on each of the modules of EXAECO.
If necessary, wedge the boxes so that the amounts of these are perfectly parallel.
Bring the modules together and secure them by tightening the bolts (provided) with the mounting brackets (M6 x 16). Also
tighten the M8 X30 bolt (supplied) on the chassis.
II.2.a.1.
Climatic module (version ELITE)
Connect the 2 quick connectors and the clear tube for the LOBBY versions.