23
WALL -TILE - MOON - LEAN
Fig. 48 - Screw removal
Fig. 49 - Coque removal
Fig. 50 - Gear motor removal
• Enter the tank and loosen the 4 screws of the feed screw coque (see
• Remove the coque (see
).
• Remove the gear motor by loosening the locking screw (see
Fig. 51 - Spiral removal
Fig. 52 - Bearing removal
• Remove the spiral (see
).
• If worn, remove the bearing (see
) and replace it.
• To reassemble, proceed in reverse order.
7.3
FUME FAN CLEANING
Clean every the year the fume fan from ash or dust which can cause a blade unbalance and a greater noise.
As this operation is so delicate it must therefore be executed by an Authorized Technician.
Fig. 53 - Fume fan cleaning: phase1
Fig. 54 - Phase 2
Fig. 55 - Phase 3
• Follow the process as describer in
.