background image

                                                                                                Page 1    /    19 

PLEASE

 

KEEP

 

THESE

 

INSTRUCTIONS

 

FOR

 

FUTURE

 

REFERENCE 

HP-24 

7KW 

HP

-

24G 

9KW

 

 

PELLET

 

STOVE

 

OWNER

S

 

MANUAL 

 

 
 

Contact

 

your

 

building

 

or

 

fire

 

officials

 

about

 

restrictions

 

and 

installation

 

inspection

 

requirements

 

in

 

your

 

area. 

 

 
PLEASE

 

READ

 

THIS

 

ENTIRE

 

MANUAL

 

BEFORE

 

INSTALLATION

 

AND

 

USE

 

OF

 

THIS

 

PELLET

 

BURNING

 

ROOM

 

HEATER.

 

FAILURE

 

TO

 

FOLLOW THESE

 

INSTRUCTIONS

 

COULD

 

RESULT

 

IN

 

PROPERTY

 

DAMAGE,

 

BODILY INJURY, OR

 

EVEN

 

DEATH. 

 
 

THIS

 

MANUAL

 

IS

 

PRINTED

 

ON

 

RECYCLED

 

PAPER. 

PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.

 

Содержание HP24

Страница 1: ...estrictions and installation inspection requirements in your area PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS PELLET BURNING ROOM HEATER FAILURE TO FOLLOW THESE INSTRUCTIONS COU...

Страница 2: ...6 9 Troubleshooting 17 10 Warranty 18 11 Figure Electricity control 19 Technical Specification Stove Mass 98 kg Nominal output Maximum setting Total Efficiency 92 3 Nominal Heat Output 9 4 kW Mean CO...

Страница 3: ...ed pellet type P F I PELLET STANDARDS Fines fine particles 1 maximum through a 3 mm 1 8 screen Bulk Density 650 kg m3 minimum Size 6 mm to 8 mm diameter 12mm to 35 mm long Ash Content 1 maximum Premiu...

Страница 4: ...s The stove s exhaust system works with negative combustion chamber pressure and a slightly positive chimney pressure A chimney draught of 12 Pa can be regarded as typical when operating at maximum ou...

Страница 5: ...sposed ashes should be placed in a metal container The closed container of ashes should be on a non combustible floor on the ground well away from all combustible materials pending final disposal If t...

Страница 6: ...T DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE FRESH AIR Outside Fresh Air connection is optional It must be connected to all units installed in Mobile and Air Tight Homes R200...

Страница 7: ...ature is still above 120 F 52 C Product performance The pellet stove has an advanced designed and has individual fresh air input and venting system Negative pressure burning technology causes high eff...

Страница 8: ...clearance between the walls or to the top should be no less than the size in the figure Min installation clearance mm 2 Electrical The unit must be grounded earthed The grounded electrical cord should...

Страница 9: ...fumes into the room The stove air input pipe diameter is 50 mm venting pipe diameter is 80 mm The total length of pipes is not longer than 3m Indoor venting pipe joint should be sealed by silicone sea...

Страница 10: ...Page 10 19...

Страница 11: ...l Temp and Weekly 5 TIMER BUTTON Order the start time or shutdown time of the unit Press Timer then set the period of time you needed attention the maximum is 7 hours Minimum is 1 hour After setting 5...

Страница 12: ...WEEKLY PROGRAMMER Temperature Units Blower Voltage and Exhaust Voltage Restore default setting and use Diagnostic platform are also access 8 CONCEL BUTTON 9 UP AND DOWN BUTTON Three status s descript...

Страница 13: ...TEMPERATURE 5 MAIN MODE HEATING POWER LEVEL IGNITOR COMBUSTION BLOWER blower AUGER CONVECTION BLOWER VACUUM SWITCH LIMIT SWITCH ON OFF STATE ADDITIONAL CONTROL MODE MAIN MODE DATE and TIME WORK STAGE...

Страница 14: ...The stove will power off and the fire will be put out when the auger motor stops b The stove will power off and the fire will be put out when the convection blower stops c Auger motor stops feeding w...

Страница 15: ...round the stove when it is operating 3 When installing this unit on a combustible floor for example linoleum hardwood flooring a non combustible hearth pad 15mm thickness with sufficient load bearing...

Страница 16: ...way any fly ash that may have collected on the heat exchanger tubes 5 Put the ash in the ash drawer out TIMELY 6 When the appliance is not to be used for a long time it should be cleaned completely Es...

Страница 17: ...ht the high temperature switches connection Change the high temperature switch D Three lights aren t bright No 220V power Pellet feeder is power off The wires of start and clock unit loose or break Ch...

Страница 18: ...own the blower Clean the heat exchange tubes 8 Ash and smoke fly out Leak between the connection of convection motor and venting pipe The clean method is wrong Use silicon rubber to seal Clean the dus...

Страница 19: ...Page 19 19...

Отзывы: