ATENA - DUKE - SABA - MITHOS
20
Fig. 42 - Upper panel 1
Fig. 43 - Upper panel 2
Fig. 44 - Fix upper panel
• Take the lower panel and fold the 2 tabs upwards (see
Fig. 45
).
• Fit the external hooks into the provided slots (see
Fig. 46
).
• To lock the lower panel, fix the previously folded tabs to the air outlets (see
Fig. 47
).
Fig. 45 - Fold the tabs
Fig. 46 - Lower panel
Fig. 47 - Fix lower panel
6.12 MOUNTING SERPENTINE STONE FRAME (MITHOS)
To assemble the frame, proceed as follows:
• Lift the side flaps (on both sides) to fix the lower finish profile (see
Fig. 48
Fig. 49
)
Fig. 48 - Lift flaps 1
Fig. 49 - Lift flaps 2
• Loosen the air outlet vents
Fig. 50
(RH and LH) by undoing the 4 screws