ATENA - DUKE - SABA - MITHOS
2
SUMMARY
1 MANUAL SIMBOLOGY ....................................3
2 PACKAGING AND HANDLING ..........................3
2.1 PACKAGING .............................................................3
2.2 REMOVING THE STOVE FROM THE PALLET ..............3
2.3 STOVE HANDLING....................................................4
3 CHIMNEY FLUE .............................................4
3.1 PREPARING THE SMOKE EXPULSION SYSTEM .........4
3.2 CHIMNEY COMPONENTS .........................................4
3.3 SMOKE DUCT (SMOKE FITTING) ..............................5
3.4 FLUE (CHIMNEY OR PIPED DUCT) ...........................5
3.5 CHIMNEY POT ..........................................................6
3.6 MAINTENANCE ........................................................7
4 COMBUSTION AIR .........................................7
4.1 AIR INLET ................................................................7
4.2 COMBUSTIBLE AIR INLET FOR SEALED-CHAMBER
INSTALLATION ...................................................................8
5 EXAMPLES OF INSTALLATION (DIAMETERS AND
LENGTHS TO BE SIZED) ........................................9
6 INSTALLATION ............................................10
6.1 INTRODUCTION .....................................................10
6.2 MINIMUM DISTANCES ...........................................11
6.3 OVERALL DIMENSIONS .........................................12
6.4 STOVE DOOR REMOVAL/INSTALLATION ................15
6.5 REMOVAL OF CAST IRON COVER AND CAPS (ATENA
3
PLUS 12/14 - DUKE 12/14 AIRTIGHT) ..............................15
6.6 REMOVAL/ASSEMBLY OF SIDE PANELS (DUKE 12/14
AIRTIGHT - SABA 12/14) ..................................................16
6.7 REMOVAL/ASSEMBLY OF BACK PANELS (ATENA
3
PLUS
12/14) ..............................................................................17
6.8 REMOVAL/ASSEMBLY OF TILE PROFILES (ATENA
3
PLUS 12/14) .....................................................................17
6.9 REMOVAL/ASSEMBLY OF METAL PROFILES (ATENA
3
PLUS 12/14) .....................................................................18
6.10 TILES ASSEMBLY (ATENA
3
PLUS 12/14).................18
6.11 METAL FRAME ASSEMBLY (MITHOS
3
PLUS 12/14) 19
6.12 MOUNTING SERPENTINE STONE FRAME (MITHOS) 20
6.13 REMOVAL OF SIDE PANELS (MITHOS3 PLUS 12/14) 23
6.15 REAR OR UPPER FUME EXHAUST (ATENA PLUS 12/14
- DUKE 12/14 AIRTIGHT - SABA 12/14) ...........................23
6.16 CONCENTRIC PIPE-KIT ASSEMBLY (ATENA PLUS
12/14 - DUKE 12/14 AIRTIGHT - SABA 12/14) .................24
6.17 HOT AIR DUCTING SYSTEM (ATENA
3
PLUS 12/14 -
DUKE 12/14 AIRTIGHT - SABA 12/14) ..............................25
6.18 HOT AIR DUCTING (MITHOS3 PLUS 12/14) ...........27
6.19 USING THE STOVE WITHOUT DUCTING (ATENA
3
PLUS
12/14 - DUKE 12/14 AIRTIGHT - SABA 12/14) .................30
6.20 ELECTRIC CONNECTION .........................................31
6.21
STOVE CALIBRATION AND DEPRESSION
MEASUREMENT ...............................................................31
6.22 CONNECTION TO THE EXTERNAL THERMOSTAT .....32
7 SPECIAL MAINTENANCE ..............................33
7.1 INTRODUCTION .....................................................33
7.2 FUME CHAMBER CLEANING ..................................33
7.3 FUME CONDUIT CLEANING ....................................34
7.4 FUME PASSAGE CLEANING ....................................34
7.5 FUME FAN CLEANING ............................................35
7.6 ROOM FAN CLEANING ...........................................36
8 IN CASE OF ANOMALY ..................................36
8.1 PROBLEM SOLVING ...............................................36
9 TECHNICAL DATAS ......................................39
9.1 REPAIR INFORMATION ..........................................39
10 FEATURES ..................................................40