2-5
Preparing and Installing the 9A426-01 Module
Unpacking an APIM
1. Remove the APIM from the shipping box. (Save the box and packing
materials in the event the APIM must be reshipped.)
2. Remove the APIM from the non-conductive bag.
3. Examine the APIM and check for damage. If damage exists, DO NOT proceed;
contact Cabletron Systems Technical Support. Otherwise, place the APIM
back into the non-conductive bag, set the APIM aside, and proceed.
Figure 2-3. An APIM-21
80 position (female) connector
Содержание 9A426-01
Страница 1: ...903number SmartSwitch 9000 9A426 01 ATM Module User s Guide ...
Страница 2: ......
Страница 13: ...1 5 Introduction Figure 1 1 The 9A426 01 Module SMB CPU A T M 1 A T M 2 FNB INB 9A426 01 ATM ...
Страница 16: ...Introduction 1 8 ...
Страница 46: ...LANVIEW LEDs 4 6 ...
Страница 50: ...Specifications 5 4 ...