2019/08 - Indice de révision : D - Code : 29650
TRAITEMENT DE L'EAU
46/72
4.5
Installation of the acid dosing pump
The acid dosing pump should be installed right after the chlorinator cell, in a way that ensures the cell
stays full of water even when the circulation pump turns off. Choose one of the plumbing configuration
options below:
4.5.1 U shape installation
1. Dosing acid pump and saddle clamp
2. Chlorinator Cell
3. Tee with pH and ORP sensors
4. Flow switch Tee
4.5.2 Horizontal installation
1. Dosing acid pump and saddle clamp
2. Chlorinator Cell
3. Tee with pH and ORP sensors
4. Flow Switch Tee
!
NOTE: A plumbing trap is required to keep the cell flooded with water when the dosing acid pump
washes the cell during the circulation pump downtime. Create the trap so the acid injected by the
dosing acid pump will be focused on the cell and not flow back to the pool or equipment set.
!
WARNINGS
Disconnect ALL power before work commences.