Boiler block assembly
8
Logano GE515 - We reserve the right to make any changes due to technical modifications.
20
z
Position the rear section and secure against tipping
over with the installation template (Fig. 11 and Fig. 9
as well as the separate installation instructions for
the installation template).
z
Remove possible burrs from the hub using a file
(Fig. 12).
z
Clean the packing groove (Fig. 13,
[3]
) where
necessary using a wire brush and cloth.
z
Clean the hub sealing faces (Fig. 13,
[1]
and
[2]
) with
a cloth soaked in white spirit.
z
Coat the hub sealing faces evenly with jointing
compound.
Fig. 11 Secure the installation template
Fig. 12 Remove burr
CAUTION!
DANGER OF BURNING
through flammable solvents.
z
When using solvents, avoid naked
flames, incandescence and sparks.
z
Please observe the safety instructions
regarding any solvents used.
Fig. 13 Prepare packing grooves and hubs
2
1
3