System inspection and maintenance
14
Logano GE515 - We reserve the right to make any changes due to technical modifications.
64
Demand-dependent maintenance work
Page
(individual steps)
Comments
1.
System shutdown
2.
Remove and clean the hot gas baffle plates
3.
Clean the hot gas flues (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the flue gas collector
6.
Install the hot gas baffle plates
7.
Check and, if required, replace gaskets/packing cord on
burner and burner door
Æ
burner documentation
8.
System start-up
9.
Final check of the maintenance work; document the
measurement and test results
Æ
burner documentation
10.
Check the function and safety in operation
Æ
burner documentation
Confirm the professional maintenance with signature, date and company stamp