Boiler block assembly
8
Logano GE515 - We reserve the right to make any changes due to technical modifications.
26
8.3
Positioning the boiler block – for pre-
assembled deliveries
z
Cut through the strapping bands (Fig. 23,
[1]
).
z
Remove the pallet prior to positioning the boiler
(Fig. 23,
[2]
).
z
Align the boiler block on the plinth or anti-vibration
base in the horizontal and vertical plane
(
chapter 7.3 "Positioning the boiler on a sub-
structure or on foundations", page 17). To do this use
the boiler section base wedges supplied
The feed pipe and sensor well installation is described
on the following pages. Install both with pre-assembled
boilers and those supplied as loose sections.
Fig. 23 Boiler block on pallet
1
2
CAUTION!
DANGER TO LIFE
from falling material.
z
Ensure a suitable means for bearing
the load is available.
z
Observe the safety regulation VBG9a
"Load bearing equipment when using
lifting gear" or local regulations.