2
Burner installation
30
Installation and maintenance instructions Logano GE315 • Issue 02/2006
We reserve the right to make any changes due to technical modifications.
z
Hook the burner door cover into the front wall
recesses (Fig. 42,
Item 1
).
z
Place the data plate (Fig. 42,
) according to
boiler location on the r.h. or l.h. side wall.
2.8
Control unit
2.8.1
Controller installation
Fig. 43 shows the control unit and the front cover as
viewed from the rear.
z
Loosen both screws (Fig. 43,
Item 1
) securing the
terminal cover. Remove the terminal cover by pulling
it upwards.
z
Mount the control unit. Insert the control unit at the
front of the boiler with the locating tabs (Fig. 43,
) into the oval apertures of the front boiler hood
). Pull the control unit forward and
then pivot it back. Ensure that the resilient hooks
(Fig. 43,
) engage at the rear into the
rectangular apertures of the front boiler hood (Fig. 43,
).
z
Secure the control unit base on the r.h. and l.h. side
of the cable way (Fig. 43,
Item 6
) in the front boiler
hood with two self-tapping screws (Fig. 43,
Item 7
).
NOTE!
For boilers delivered as pre-assembled
blocks you will find the data plate together
with the installation and maintenance
instructions inside the combustion
chamber; if you receive loose components
you will find it inside a clear bag on the
burner door.
Fig. 42
Hooking on the burner door cover
Fig. 43
Control unit installation
1
2
1
2
4
5
6
3
7