11
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
2
Installation
2.4
Installation of boiler sections
The boiler block is available either pre-assembled or
unassembled in sections. For pre-assembled blocks,
the boiler sections are pre-assembled and checked for
leaks prior to despatch. If, because of physical
limitations, a boiler block cannot be delivered as
a complete unit, on site installation is carried out using
separate sections.
For the further
installation of pre-assembled boiler
segments,
see chapter "2.4.3 Aligning the boiler block
for pre-assembled deliveries", page 17.
2.4.1
Arrangement of the boiler sections within
the boiler block (unassembled)
The boiler block is assembled from the rear to the front,
commencing with the rear segment (Fig. 5,
Item 4
).
Always assemble the front section (Fig. 5,
) last.
During assembly note the arrows denoting the direction
of installation (Fig. 5,
) and proceed according to
the following instructions and illustrations!
ATTENTION!
Risk of injury through inadequately
secured boiler sections!
For your own safety, use only suitable
means of transportation when handling the
boiler sections, e.g. a sack truck with strap
or a stair truck, etc. When handling, secure
the boiler sections to the means of
transport to prevent them slipping.
ATTENTION!
Risk of injury through inadequately
secured boiler sections!
Secure the rear section against tipping!
Where available you can use lifting gear to
safely position the boiler sections.
Fig. 5
Boiler block
Legend (Fig. 5):
Item 1: Plinth or vibration absorbing boiler plinth
Item 2: Drain
Item 3: Flue gas collector
Item 4: Rear section
Item 5: Return connection
Item 6: Flow connection
Item 7: Central sections
Item 8: Tie bar
Item 9: Arrow – assembly direction pointing towards rear
Item 10: Front section
Item 11: Burner door with burner plate
Fig. 6
Rear section
1
3
4
7
8
9
11
6
8
10
5
2
FRONT
REAR