17
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
2
Installation
2.4.3
Aligning the boiler block for pre-assembled
deliveries
z
Cut through the securing band (Fig. 18,
Item 1
).
z
Remove the pallet prior to positioning the boiler
(Fig. 18,
).
z
Align the boiler on the plinth or antivibration
absorbing plinth in the horizontal and vertical plane
(see chapter "2.3 Positioning", page 9). To do this
use the boiler section base wedges supplied.
The return header and sensor well installation
described on the following pages applies to boilers
delivered as pre-assembled in sections.
CAUTION
DANGER TO LIFE!
Hazard from falling material!
Hazard through falling from unsuitable
means of transportation!
Observe Health and Safety at Work
Regulations regarding lifting with lifting
gear!
(For weight details of various boiler sizes
see section "Dimensions and
specification", page 35).
Fig. 18
Boiler block on pallet
1
2